2021 year
Mobile direct heating unit MUPN of the formation water separation system was put into operation to provide heating of the incoming liquid with subsequent separation of produced water in the settling units.
2021 year
Mobile indirect heating unit MUN-4-PNPT-4.25 was commissioned, which is designed to heat liquid due to the increase in the amount of incoming liquid and change of its parameters
2018 year
The customer needed an oil treatment unit with heating of the incoming products.
According to the terms of reference, our scientific and technical center has proposed a unit with a volume of V = 115 m3.
According to the terms of reference, our scientific and technical center has proposed a unit with a volume of V = 115 m3.
2018 year
Pump station of fire-fighting water supply has been commissioned.
2016 year
The pump station of industrial and fire-fighting water supply was successfully commissioned
2016 year
Four sets of KDFT pipe end phase dividers designed for separation of well production and formation water treatment to the required standards were supplied.
2016 year
Pump station enclosure-box is successfully operated above the artesian well.