2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2020 year
The water heating boiler unit was shipped to the Customer in full factory readiness. The installation works are currently in final stages. The commissioning is scheduled for September 2020.
2016 year
Water heating boiler plant UKM-0.8VGZh designed for heat supply of buildings and constructions has been shipped. Boiler plant is a process complex consisting of transportable pre-fabricated module.