Year
2020
Category
Boiler plants
The water heating boiler unit was shipped to the Customer in full factory readiness. The installation works are currently in final stages. The commissioning is scheduled for September 2020.
The installed capacity of the boiler plant is 28 MW.
The installed capacity of the boiler plant is 28 MW.
Would you like to discuss your project?
Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible
Other projects
2021 year
Installation of thermal insulation internal layers and staged burner system of closed flare unit UFBG has been completed.
2021 year
Heaters PNPT-3.87 designed to heat oil and their mixtures in the system of collection, transportation, and preparation of well products has been manufactured and shipped to the Customer.
2021 year
Another recuperator unit was manufactured and shipped to the customer, which is designed for combustion of permanent, periodic, and emergency gas discharges and their disposal by means of heat recovery for heating of recycled process water using the heat of exhaust gases.
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.







