Closed flare unit UFBG - Projects «Bunter Group»

Projects Closed flare unit UFBG

Year
2021
Category
Flare systems

Installation of thermal insulation internal layers and staged burner system of closed flare unit UFBG has been completed.

The maximum capacity by combusted gases will be over 285 tons/hour.

The height of the plant is 44 meters, the diameter of the combustion chamber is 19 meters, the diameter of the wind and noise fence is 26 meters.

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2019 year
The customer needed a regeneration gas heating furnace as part of the gas treatment unit.
2018 year
Pump station of fire-fighting water supply has been commissioned.
2020 year
Our set of AGNKS equipment consists of an external gas accumulator unit and a process enclosure-box.
2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2018 year
The water pumping station has been commissioned.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности