Year
2016
Category
Process comlexes
Four sets of KDFT pipe end phase dividers designed for separation of well production and formation water treatment to the required standards were supplied.
Calculation and selection of parameters, as well as the development of a full set of design documentation was carried out by proprietary research and development center in Saratov.
Would you like to discuss your project?
Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible
Other projects
2021 year
Mobile direct heating unit MUPN of the formation water separation system was put into operation to provide heating of the incoming liquid with subsequent separation of produced water in the settling units.
2020 year
Our set of AGNKS equipment consists of an external gas accumulator unit and a process enclosure-box.
2021 year
Installation of thermal insulation internal layers and staged burner system of closed flare unit UFBG has been completed.
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.
2022 year
Bunter Group has completed installation of one of the two 019-P-1.1 and 019-P-1.2 furnace units manufactured for the condensate de-ethanization unit.