Pump station of industrial and fire-fighting water supply - Projects «Bunter Group»

Projects Pump station of industrial and fire-fighting water supply

Year
2016
Category
Process comlexes

The pump station of industrial and fire-fighting water supply was successfully commissioned.

Pump station building of industrial-fire water supply, overall dimensions 6000x9000x3000 (h) m, code 1156P-UP-62, is designed for controlled delivery to the fire water supply network and ensure water circulation in the fire-fighting water lines. 

The pump station is designed to house 2 groups of pumps which supply water for fire-fighting, production, and circulation purposes.

The facility has been designed in accordance with safety, industrial sanitation, occupational health, fire and explosion safety, and environmental protection regulations in force in the Russian Federation.

The scope of equipment of the modular pump station ensures functional suitability and full operability.

All supplied equipment, devices, and materials comply with the regulations, rules, and standards in force in the Russian Federation at the time of commissioning.  

Calculation and selection of parameters, as well as the development of a full set of design documentation was carried out by proprietary design department.

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2019 year
This is an auxiliary unit for operation of the main equipment of booster compressor station (BCS).
2021 year
Heater with intermediate coolant PPT-0.2G designed for heating oil emulsions in oil collection and transportation systems, as well as natural or associated gas and waste field water at gas-distributing units of gas-lift oil production system, has been manufactured and shipped to the Customer.
2020 year
Capacitance water heater PVE-3.5 with heating capacity of 3.5 MW designed to heat water in the collection, transportation, and well product preparation systems is successfully operated.
2016 year
Four sets of KDFT pipe end phase dividers designed for separation of well production and formation water treatment to the required standards were supplied.
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности