Year
2020
Category
Oil and gas equipment
Capacitance water heater PVE-3.5 with heating capacity of 3.5 MW designed to heat water in the collection, transportation, and well product preparation systems is successfully operated.
The design was carried out by the design department specialists.
The design was carried out by the design department specialists.
Would you like to discuss your project?
Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible
Other projects
2016 year
Flare unit designed for high-efficiency and high-quality combustion of periodic, permanent, and emergency discharges of combustible gases at oil and gas field treatment facilities in oil and gas fields, as well as oil, gas, and petrochemical industry enterprises, has been manufactured and shipped to the Customer.
2019 year
The customer needed a regeneration gas heating furnace as part of the gas treatment unit.
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.
2022 year
Bunter Group has completed installation of one of the two 019-P-1.1 and 019-P-1.2 furnace units manufactured for the condensate de-ethanization unit.