Capacitance water heater PVE-3.5 with heating capacity of 3.5 MW designed to heat water in the collection, transportation, and well product preparation systems is successfully operated.
The design was carried out by the design department specialists.
The design was carried out by the design department specialists.
Would you like to discuss your project?
Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible
Other projects
2020 year
A recuperator unit designed for beneficial use of the combustion heat of excessive flow of associated petroleum gas has been shipped.
2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2016 year
Four sets of KDFT pipe end phase dividers designed for separation of well production and formation water treatment to the required standards were supplied.
2020 year
Gas treatment unit for auxiliaries is designed for purification, heating, and reduction of natural gas pressure of main gas pipelines to the required pressure and maintaining it with a specified accuracy before supplying to the consumer.
2021 year
Mobile direct heating unit MUPN of the formation water separation system was put into operation to provide heating of the incoming liquid with subsequent separation of produced water in the settling units.