Combustion chamber of the agent heating unit UNA-20.5-15-2.3-1 - Projects «Bunter Group»

Projects Combustion chamber of the agent heating unit UNA-20.5-15-2.3-1

Year
2020
Category
Flare systems

A recuperator unit designed for beneficial use of the combustion heat of excessive flow of associated petroleum gas has been shipped.

Unit capacity by coolant heating is 42 m3/h.

Capability by recycled gas is 860 nm3/h.

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2021 year
Heaters PNPT-3.87 designed to heat oil and their mixtures in the system of collection, transportation, and preparation of well products has been manufactured and shipped to the Customer.
2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2018 year
The water pumping station has been commissioned.
2022 year
Bunter Group has completed installation of one of the two 019-P-1.1 and 019-P-1.2 furnace units manufactured for the condensate de-ethanization unit.
2019 year
This is an auxiliary unit for operation of the main equipment of booster compressor station (BCS).

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности