Bunter Group has completed installation of one of the two 019-P-1.1 and 019-P-1.2 furnace units manufactured for the condensate de-ethanization unit. The furnaces are designed for heating and evaporation of light fractions in gas condensate. The capacity of the unit is up to 277,000 kg per hour. The useful heat output of the furnaces is 13.7 MW.

The furnace was started up on June 13. After concrete drying, the furnace operates at temperatures and flow rates higher than nominal modes, providing the de-ethanization column with raw materials of necessary specifications. The actual efficiency of the furnace corresponds to the calculated values.

Cylinder furnaces manufactured by the Bunter Group are supplied to the customer with fuel gas preparation units, inlet product lines, and outlet product lines. Frame valve blocks provide fuel gas supply to pilot and main burners, its reduction, flow measurement, and purification from mechanical impurities. Product line units ensure that the product is evenly distributed across the two coil streams.

The pipeline connection between furnaces and control system with process controller and emergency protection controller allows the furnace to be operated safely in accordance with federal standards and regulations.

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2021 year
Mobile indirect heating unit MUN-4-PNPT-4.25 was commissioned, which is designed to heat liquid due to the increase in the amount of incoming liquid and change of its parameters
2021 year
Heaters PNPT-3.87 designed to heat oil and their mixtures in the system of collection, transportation, and preparation of well products has been manufactured and shipped to the Customer.
2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2018 year
Pump station of fire-fighting water supply has been commissioned.
2016 year
Water heating boiler plant UKM-0.8VGZh designed for heat supply of buildings and constructions has been shipped. Boiler plant is a process complex consisting of transportable pre-fabricated module.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности