Mobile indirect heating unit MUN-4-PNPT-4.25 was commissioned, which is designed to heat liquid due to the increase in the amount of incoming liquid and change of its parameters
Scope of works carried out during the design, delivery, and start-up:
-
- - design and development of design documentation;
- - manufacturing and testing of MUN units at the manufacturer's plant;
- - supply and placement of MUN equipment units;
- - construction and installation works to connect the equipment to the existing communications and power supply systems;
- - commissioning and individual testing (delivery of executive documentation);
- - comprehensive testing (mode adjustment) and personnel training;
- - obtaining a positive conclusion of the expert examination of industrial safety and transfer of the documents of title.
-
Would you like to discuss your project?
Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible
Other projects
2016 year
The pump station of industrial and fire-fighting water supply was successfully commissioned
2020 year
The water heating boiler unit was shipped to the Customer in full factory readiness. The installation works are currently in final stages. The commissioning is scheduled for September 2020.
2019 year
This is an auxiliary unit for operation of the main equipment of booster compressor station (BCS).
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.
2021 year
Fuel gas treatment unit is designed for preparation of fuel gas for the boiler unit of UKPG-1, gas for the methanol regeneration unit, gas for the flare system VD, ND, and UGG (purification, heating, flow measurement, and gas pressure reduction before supplying to the consumer).