Flare tips - Projects «Bunter Group»

Projects Flare tips

Year
2022
Category
Flare systems

Works on re-equipment and replacement of the flare stack were performed.

Unit capacity — 1,000,000 kg/h

Smokelessness range — 0...25,000 kg/h

Steam flow rate — 12,000 kg/h

Purge gas flow rate — 203.5 nm3/h

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2021 year
Newly designed indirect heater has been manufactured and shipped to the Customer.
2022 year
Bunter Group has completed installation of one of the two 019-P-1.1 and 019-P-1.2 furnace units manufactured for the condensate de-ethanization unit.
2020 year
Gas treatment unit for auxiliaries is designed for purification, heating, and reduction of natural gas pressure of main gas pipelines to the required pressure and maintaining it with a specified accuracy before supplying to the consumer.
2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2020 year
A recuperator unit designed for beneficial use of the combustion heat of excessive flow of associated petroleum gas has been shipped.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности