Flare tips

Flare tips

Year
2022
Category
Flare systems

Works on re-equipment and replacement of the flare stack were performed.

Unit capacity — 1,000,000 kg/h

Smokelessness range — 0...25,000 kg/h

Steam flow rate — 12,000 kg/h

Purge gas flow rate — 203.5 nm3/h

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2016 year

Pump station enclosure-box is successfully operated above the artesian well.

2016 year
Flare unit designed for high-efficiency and high-quality combustion of periodic, permanent, and emergency discharges of combustible gases at oil and gas field treatment facilities in oil and gas fields, as well as oil, gas, and petrochemical industry enterprises, has been manufactured and shipped to the Customer.
2019 year
The customer needed a regeneration gas heating furnace as part of the gas treatment unit.
2016 year
Four sets of KDFT pipe end phase dividers designed for separation of well production and formation water treatment to the required standards were supplied.
2018 year
The customer needed an oil treatment unit with heating of the incoming products.
According to the terms of reference, our scientific and technical center has proposed a unit with a volume of V = 115 m3.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности