Works on re-equipment and replacement of the flare stack were performed.

Unit capacity — 1,000,000 kg/h

Smokelessness range — 0...25,000 kg/h

Steam flow rate — 12,000 kg/h

Purge gas flow rate — 203.5 nm3/h

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2018 year
The customer needed an oil treatment unit with heating of the incoming products.
According to the terms of reference, our scientific and technical center has proposed a unit with a volume of V = 115 m3.
2021 year
Installation of thermal insulation internal layers and staged burner system of closed flare unit UFBG has been completed.

2021 year
Heater with intermediate coolant PPT-0.2G designed for heating oil emulsions in oil collection and transportation systems, as well as natural or associated gas and waste field water at gas-distributing units of gas-lift oil production system, has been manufactured and shipped to the Customer.
2020 year
The water heating boiler unit was shipped to the Customer in full factory readiness. The installation works are currently in final stages. The commissioning is scheduled for September 2020.
2019 year
The customer needed a regeneration gas heating furnace as part of the gas treatment unit.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности