Year
2021
Category
Process comlexes
Mobile direct heating unit MUPN of the formation water separation system was put into operation to provide heating of the incoming liquid with subsequent separation of produced water in the settling units.
The design was carried out by the design department specialists. The device was manufactured at the Syzran plant.
Would you like to discuss your project?
Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible
Other projects
2020 year
A recuperator unit designed for beneficial use of the combustion heat of excessive flow of associated petroleum gas has been shipped.
2021 year
Heater with intermediate coolant PPT-0.2G designed for heating oil emulsions in oil collection and transportation systems, as well as natural or associated gas and waste field water at gas-distributing units of gas-lift oil production system, has been manufactured and shipped to the Customer.
2016 year
The pump station of industrial and fire-fighting water supply was successfully commissioned
2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2020 year
The water heating boiler unit was shipped to the Customer in full factory readiness. The installation works are currently in final stages. The commissioning is scheduled for September 2020.