Gas treatment unit for auxiliaries is designed for purification, heating, and reduction of natural gas pressure of main gas pipelines to the required pressure and maintaining it with a specified accuracy before supplying to the consumer.
All process equipment is located in four enclosure-boxes which form a single modular building divided into two compartments: process compartment and coolant treatment compartment.
The design was carried out by the gas equipment design department specialists. The device was manufactured at the Yekaterinburg plant.
Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible